Agree the details before work starts
Before the team arrives on site, the drawings, charger data, civil details, cable schedule and who-does-what should all tell the same story. Most site delays come from small mismatches, like a foundation that doesn’t suit the charger base or a cable size that changed after the drawing was issued.