APP infra

EV charging · Hyderabad · South India

From charger supply
to switch‑on.

AC and DC chargers, site engineering and installation. One team from survey to support.

~100 days

Typical survey to switch-on, depending on DISCOM approvals

AC + DC

Chargers from Exicom and Bolt Earth, matched to your site

1 team

Survey, design, approvals, installation and AMC

3 states

Telangana, Andhra Pradesh and Karnataka, from Hyderabad

What we do

One team from survey to switch‑on.

APP infra is an EV charging infrastructure company. We supply AC and DC chargers, design the electrical and civil works your site needs, and manage installation through to commissioning and handover. One team owns the project from the first site survey to switch-on—so you’re not coordinating between a charger vendor, an electrician and a civil contractor separately.

We work with fleet operators, commercial building owners, retail sites, highway operators and apartment communities planning EV charging across South India. Every site starts with a power and load assessment, so the equipment we recommend matches your site’s sanctioned load and your vehicles’ charging needs.

Built for the sites
India is electrifying.

All industries

Chargers we supply,
engineered into your site.

Charger supply

Exicom · Bolt Earth

AC

AC chargers

Apartments, offices, hotels and fleet depots where vehicles stay parked for hours.

  • Lower installation cost
  • Simple power connection
  • App or RFID billing
DC

DC fast chargers

Highways, fuel stations, restaurants and busy fleets that need a charge in minutes.

  • High-power charging
  • HT connection planning
  • Canopy and forecourt works

Real sites.
Real progress.

Short clips from our teams on the ground: site preparation, equipment lifting and installation work across South India.

More on Instagram
Field update 01

Infrastructure in progress

Field update 02

Engineering on site

How we work

Assess. Plan. Perform.

We check the site and power requirement, select suitable equipment, then coordinate the works through testing and handover.

  1. 01

    Assess

    Site survey, load study and DISCOM connection check, so the charger spec matches what your site can actually support.

  2. 02

    Plan

    Equipment selection (AC or DC, single or multi-port), civil and electrical design, DISCOM approvals, and a realistic timeline. Most sites go from survey to switch-on in around 100 days.

  3. 03

    Perform

    Installation, testing, commissioning and handover. Chargers come with the manufacturer’s warranty, and we offer an annual maintenance contract (AMC) after switch-on.

See our scope

Ready to plan your charging site?

Tell us about your site. We’ll schedule a free survey and give you a clear plan.

Free weekly insights

EV charging insights, every week.

One short email a week on DISCOM approvals, EV tariffs, charger choices and what we learn on site in South India. Free, no spam, unsubscribe any time.