EV charging projects across South India, delivered by one team from the first site survey to switch-on and support.

What we deliver

Project types.

Every site is different, but most of our work falls into these four types. Each link explains what the project involves.

Every project includes

One scope,
one team.

  • Site survey and load study

    We check the site, your sanctioned load and the DISCOM connection before recommending any charger.

  • Design and approvals

    SLD, layout, BOQ and the DISCOM and Electrical Inspectorate paperwork, filed early.

  • Charger supply

    AC and DC chargers from Exicom and Bolt Earth, matched to how your vehicles are used.

  • Electrical and civil works

    Panels, cabling, earthing, foundations, trenching, bollards and flooring restoration.

  • Testing and handover

    Insulation, earthing and protection tests, a live charge on every charger, and a handover pack.

  • After switch-on

    Manufacturer’s warranty on the chargers and an annual maintenance contract (AMC) for the site.

Typical timeline

Around
100 days.

Most projects take around 100 days from site survey to switch-on.

The biggest variable is DISCOM approval for a new connection or load enhancement, so we file early and plan civil and electrical work around it. Sites with enough sanctioned load already available can move faster.

Our sites

Real work, our own team.

Photos from our recent sites: the transformer yard, cabling and a night-time transformer erection, all done by APP infra’s electrical and civil teams.

New distribution transformer and electrical panels standing on concrete plinths at a charging site
Transformer yard readyDistribution transformer and LT panels on plinths our civil team cast.
Stack of galvanised cable trays and a coil of cable at a site under construction
Cable trays and cablingTrays, fittings and cable on site, ready for the electrical team.
Crane lifting a distribution transformer at night
Lifting the transformerCrane lift from the truck, done carefully at night.
APP infra team guiding a transformer onto its plinth at night
Setting it on the plinthOur team guiding the transformer into position.
Distribution transformers lined up at the factory before dispatch
Checked before dispatchTransformers inspected at the factory before they leave.

From the field

Work in progress.

Short clips from our teams on site. Watch more on our Instagram.

Case studies

Case studies, published responsibly.

Client-approved case studies will show the location, application, charging capacity, our scope and the timeline. Confidential projects can be presented without naming the client.

Discuss your project

Start with the site

Let’s engineer what’s next.

Request a Free Site Survey

Free weekly insights

EV charging insights, every week.

One short email a week on DISCOM approvals, EV tariffs, charger choices and what we learn on site in South India. Free, no spam, unsubscribe any time.